Pull over. The lanes are talking.
The Drayage desk tracks chassis pools, terminal dwell, gate hours, and the per-move economics of moving a box from ship's tackle to the rail ramp.
April TEU volumes through San Pedro Bay hit a near-record. With chassis pools running 92% utilization, intermodal ramps in the Inland Empire are the new bottleneck — and a leading indicator for May contract negotiations.